Back
greensearch - PV + BESS logo

PV + BESS - 4 MWp (Pomorskie)

greensearch - PV + BESS

Project types

PVEnergy Storage

PV Capacity

4 MWp

Storage Capacity

4 MW

Storage Capacity

8 MWh

Project status

Environmental decision obtained

Country

Poland

Voivodeship

pomorskie

County

Tczewski

Grid connection conditions

NO

Operator

Energa

Voltage

15 kV

Line length

0.04 km

Minimum rent

0 PLN/ha

Date BP

31/07/2026

Date of COD

31/01/2027

Energy sale

other

Project sale

Equity sale

Project description

Photovoltaic farm project with a capacity of up to 4.0 MWp, located in Pomorskie Voivodeship (Gniew municipality).


Key elements:

  • Land class RIVb 
  • Full land ownership – 3.74 ha
  • Issued development conditions
  • Environmental decision – 27.06.2023
  • 15 kV MV line approx. 40 m from the plot boundary
  • Within proximity to Majewo 110/15 kV Primary Substation

The project allows for the integration of an energy storage system (BESS), which increases connection flexibility and revenue optimization potential (arbitrage / peak-shaving / system services).


Connection status:

Application for grid connection conditions for commissioning (after NDA).


Should you notice any Illegal Content on the Platform, or content that violates the law, good practices, or the Terms and Conditions for the provision of services on the greensearch.pl online platform, please contact us directly at: kontakt@greensearch.pl. Please title the message "Report of Illegal Content on the Platform" and include a description of the violation along with a link to the offer containing the relevant content.

Listings added by greensearch - PV + BESS:

No other listings
PARP Logo