Project types
PV Capacity
1 MWp
Project status
Building permit obtained
Country
Poland
Voivodeship
opolskie
Grid connection conditions
YES
Operator
Tauron
Voltage
15 kV
Line length
0.4 km
Minimum rent
20,000 PLN/ha
Date BP
30/04/2025
Date of COD
31/12/2027
PV project for sale, located in Opolskie Voivodeship.
Connection capacity: 0.8 MW
Installed capacity: 0.999 MW
Cable line length: approx. 415 m.
Grid connection agreement signed.
Date of connection (COD): December 2027.
Connection cost according to the Grid Connection Agreement: PLN 50,000 net.
Building Permit: obtained (April 2025).
Environmental Decision: obtained.
Power evacuation design: completed.
The project includes a bore under PKP tracks – with all necessary approvals.
Land: owned (lease agreement to be signed with the owner).
Rent: PLN 20,000/ha annually.
Indexation: CPI
Plot area: 1.77 ha.
Project designed for 720 Wp bifacial modules, 30° tilt angle, south-facing orientation.
Possibility of expansion with energy storage (included in the building design).
Transaction structured as a transfer of project rights.
Complete set of documentation available for due diligence.
Details and access to the data room available upon contact via greensearch.
Should you notice any Illegal Content on the Platform, or content that violates the law, good practices, or the Terms and Conditions for the provision of services on the greensearch.pl online platform, please contact us directly at: kontakt@greensearch.pl. Please title the message "Report of Illegal Content on the Platform" and include a description of the violation along with a link to the offer containing the relevant content.