Project types
PV Capacity
172 MWp
Storage Capacity
110 MW
Storage Capacity
440 MWh
Number of turbines
10 units
Project status
Secured land
Country
Poland
Voivodeship
lubuskie
Grid connection conditions
NO
Hybrid project for sale:
Wind farm
Wind capacity: 62MW
Land secured for 6 turbines (37.2 MW)
Another 2 locations – at the stage of finalizing agreements.
Another 2 locations – currently under negotiation.
Discussions are ongoing with the municipality regarding the MPZP procedure, with consideration for wind energy, and have received positive feedback from residents.
Confirmation of no objections from the military regarding turbine locations.
Location is outside protection zones and areas subject to nature conservation.
Within a reasonable distance, there are several existing HV substations, including one slated for modernization, and an additional one planned.
PV + BESS:
PV capacity: 110 MW
BESS capacity: 110 MW
Land secured – approx. 135 ha.
Project status:
+ Secured lease
+ Environmental decision obtained
- Zoning Conditions / Local Spatial Development Plan (expected Q2 2026)
- Grid connection conditions: in preparation (application submission planned Q2 2026)
- Building permit: planned Q2 2027
Details, documentation, and locations are available upon contact via greensearch.
Should you notice any Illegal Content on the Platform, or content that violates the law, good practices, or the Terms and Conditions for the provision of services on the greensearch.pl online platform, please contact us directly at: kontakt@greensearch.pl. Please title the message "Report of Illegal Content on the Platform" and include a description of the violation along with a link to the offer containing the relevant content.