Project types
BESS Power
24 MW
Storage Capacity
75.68000000000001 MWh
Project status
Environmental decision obtained
Country
Poland
Voivodeship
śląskie
Grid connection conditions
YES
Operator
Tauron
Voltage
15 kV
Line length
3.1 km
Minimum rent
60,000 PLN/ha
Date BP
31/12/2026
Date of COD
24/01/2029
Energy sale
other
Project sale
Other
For sale: 3 energy storage projects located in the Silesian Voivodeship (TAURON), at the pre-RTB stage.
Two projects with the following parameters:
Charging power: 8 MW
Discharging power: 8 MW
Connection capacity: 8,000 kW
Storage capacity: 25.8 MWh
One project with the following parameters:
Charging capacity: 8 MW
Discharging capacity: 8 MW
Connection capacity: 8,000 kW
Storage capacity: 34.4 MWh
--
Land secured by a lease agreement.
Length of grid connection to GPZ: approx. 3100 m.
Grid connection agreement signed.
Planned Energization Date: 24/01/2029.
Details, documentation, and plot number are available upon contact through greensearch.
Should you notice any Illegal Content on the Platform, or content that violates the law, good practices, or the Terms and Conditions for the provision of services on the greensearch.pl online platform, please contact us directly at: kontakt@greensearch.pl. Please title the message "Report of Illegal Content on the Platform" and include a description of the violation along with a link to the offer containing the relevant content.