Storage Capacity

228 MWh

Project status

Zoning plan amended

Country

Poland

Voivodeship

mazowieckie

Grid connection conditions

YES

Operator

Energa

Voltage

110 kV

Line length

0.65 km

Date BP

31/12/2027

Date of COD

31/03/2030

Project description

For sale: a large-scale energy storage project (BESS) with a power of 50 MW and a capacity of 228 MWh, located in Mazowieckie Voivodeship.


Key project parameters:

  • Energy storage power: 50 MW
  • Energy storage capacity: 228 MWh
  • Storage operation duration: over 4 hours
  • Charging power: 50 MW
  • Discharging power: 50 MW
  • Connection voltage: 110 kV
  • Grid operator: Energa-Operator S.A.
  • Estimated connection length: approx. 650 m
  • Estimated connection cost: 625,000 PLN
  • Planned connection date according to the connection agreement: 31.03.2030
  • Planned RTB status: Q4 2027

Project status:

  • Land secured for the investment
  • Connection conditions obtained
  • Work is underway on the cable route
  • Building permit - to be obtained
  • Connection agreement - under preparation


 Detailed project documentation available upon signing an NDA.

Should you notice any Illegal Content on the Platform, or content that violates the law, good practices, or the Terms and Conditions for the provision of services on the greensearch.pl online platform, please contact us directly at: kontakt@greensearch.pl. Please title the message "Report of Illegal Content on the Platform" and include a description of the violation along with a link to the offer containing the relevant content.