Project types
Capacity
125 MW(p)
Project status
Zoning plan amended
Country
Poland
Voivodeship
mazowieckie
Grid connection conditions
YES
Operator
PSE
Voltage
220 kV
Line length
0 km
Minimum rent
0 PLN/ha
Date BP
31/12/2028
Date of COD
31/07/2031
Energy sale
other
Project sale
Other
Price
20,000 EUR/MW
Connection Voltage: 220 kV
PV Installation Capacity: 20.496 MW (approx. 25 MWp)
Energy Storage Capacity: 100 MW (grid injection) / 100 MW (grid import)
Planned energization date: July 2031
Estimated connection fee: 11,323,000.00 PLN net + VAT
The project involves connecting to the transmission grid a private distribution system integrated with a 20.5 MW photovoltaic farm and a 100 MW energy storage facility.
Based on the grid connection conditions issued by the Transmission System Operator (PSE S.A.), the project has been qualified for connection at 220 kV voltage level, with a readiness date for energization set for July 2031, assuming the grid connection agreement is signed in 2026.
The estimated grid connection fee, corresponding to the projected investment outlays, amounts to PLN 11.3 million net, with potential for adjustment at the contract signing stage.
Should you notice any Illegal Content on the Platform, or content that violates the law, good practices, or the Terms and Conditions for the provision of services on the greensearch.pl online platform, please contact us directly at: kontakt@greensearch.pl. Please title the message "Report of Illegal Content on the Platform" and include a description of the violation along with a link to the offer containing the relevant content.