100 BESS MW + 20 PV MW OSDn - PSE - 220kV - (Mazowieckie)

greensearch - BESS

Project types

Energy storage

Capacity

125 MW(p)

Project status

Zoning plan amended

Country

Poland

Voivodeship

mazowieckie

Grid connection conditions

YES

Operator

PSE

Voltage

220 kV

Line length

0 km

Minimum rent

0 PLN/ha

Date BP

31/12/2028

Date of COD

31/07/2031

Energy sale

other

Project sale

Other

Price

20,000 EUR/MW

Project description

Distribution System Connection Project (OSDn) – PV 20.5 MW + BESS 100 MW / 100 MW


Connection Voltage: 220 kV

PV Installation Capacity: 20.496 MW (approx. 25 MWp)


Energy Storage Capacity: 100 MW (grid injection) / 100 MW (grid import)


Planned energization date: July 2031

Estimated connection fee: 11,323,000.00 PLN net + VAT


The project involves connecting to the transmission grid a private distribution system integrated with a 20.5 MW photovoltaic farm and a 100 MW energy storage facility.


Based on the grid connection conditions issued by the Transmission System Operator (PSE S.A.), the project has been qualified for connection at 220 kV voltage level, with a readiness date for energization set for July 2031, assuming the grid connection agreement is signed in  2026.

The estimated grid connection fee, corresponding to the projected investment outlays, amounts to PLN 11.3 million net, with potential for adjustment at the contract signing stage.

Should you notice any Illegal Content on the Platform, or content that violates the law, good practices, or the Terms and Conditions for the provision of services on the greensearch.pl online platform, please contact us directly at: kontakt@greensearch.pl. Please title the message "Report of Illegal Content on the Platform" and include a description of the violation along with a link to the offer containing the relevant content.