PV + BESS 2 MWp + 5 MW RTB 2026/COD 2028 (Łódzkie)

greensearch - PV + BESS

Project types

PVEnergy Storage

PV Capacity

7 MWp

Storage Capacity

5 MW

Storage Capacity

12.9 MWh

Project status

Environmental decision obtained

Country

Poland

Voivodeship

łódzkie

Grid connection conditions

YES

Operator

PGE EK

Line length

0.6 km

Minimum rent

26 000 PLN/ha

Date BP

01/08/2026

Date of COD

31/12/2028

Project description

For sale: PV project with energy storage located in the Łódzkie Voivodeship (PGE Energetyka Kolejowa).


PV:

Connection capacity: 4.80 MW
Installed PV capacity: 6.9989 MW


Energy storage (BESS):
Capacity: 5 MW
Storage capacity: 12.9 MWh

Cable line length: approx. 600 m.


The grid connection agreement is currently being signed.

Connection cost according to GCA: 326,323.43 PLN net.

Planned date for obtaining the building permit: no later than 01.08.2026.


Details, documentation, and plot number are available upon contact through greensearch.

Should you notice any Illegal Content on the Platform, or content that violates the law, good practices, or the Terms and Conditions for the provision of services on the greensearch.pl online platform, please contact us directly at: kontakt@greensearch.pl. Please title the message "Report of Illegal Content on the Platform" and include a description of the violation along with a link to the offer containing the relevant content.