PV + BESS 3 MWp + 5 MW RTBCOD 2026 (mazowieckie) + grant

greensearch - PV + BESS

Project types

PVEnergy Storage

PV Capacity

2.96 MWp

Storage Capacity

5 MW

Storage Capacity

21.5 MWh

Project status

Building permit obtained

Country

Poland

Voivodeship

mazowieckie

Grid connection conditions

YES

Operator

PGE

Voltage

15 kV

Line length

1.2 km

Minimum rent

15,000 PLN/ha

Date BP

31/08/2025

Date of COD

31/08/2026

Energy sale

other

Project sale

Other

Project description

For sale: a hybrid PV + energy storage project located in Mazowieckie Voivodeship (PGE), at the RTB stage.


The project includes: 

a PV installation with a connection capacity of 2.96 MW

energy storage: charging power: 5 MW, discharging power: 2.96 MW Capacity: 21.5 MWh 


Land secured by a lease agreement – a plot with an area of 2.1524 ha. Length of connection to the Main Supply Point (GPZ): approx. 1200 m. 


Connection agreement signed (PGE). 

Connection cost according to the Connection Agreement (UP): 210,750 PLN gross.


Project submitted to NFOŚ – capacity 21.5 MWh. 

Grant awarded. No submission to the capacity market CfD.


Standby rent: 200 PLN.
Target lease rent: 15,000 PLN.

Should you notice any Illegal Content on the Platform, or content that violates the law, good practices, or the Terms and Conditions for the provision of services on the greensearch.pl online platform, please contact us directly at: kontakt@greensearch.pl. Please title the message "Report of Illegal Content on the Platform" and include a description of the violation along with a link to the offer containing the relevant content.