Project types
Capacity
125 MW(p)
Storage Capacity
0 MWh
Project status
Secured land
Country
Poland
Voivodeship
wielkopolskie
Grid connection conditions
YES
Operator
PSE
Voltage
110 kV
Line length
0 km
Minimum rent
0 PLN/ha
Date BP
06/01/2031
Date of COD
06/01/2031
Energy sale
other
Project sale
Other
Price
20,000 EUR/MW
Connection voltage: 110 kV
PV installation capacity: 20.496 MW (approx. 25 MWp)
Energy Storage Capacity: 100 MW (grid injection) / 100 MW (grid import)
Planned readiness date for voltage supply: January 2031
Estimated connection fee: 10,390,000.00 PLN net + VAT
The project includes connection to the transmission grid of a non-public distribution system integrated with a photovoltaic farm with an electrical capacity of 20.5 MW and an energy storage system with a capacity of 100 MW.
In accordance with the grid connection conditions issued by the Transmission System Operator, the project has been positively assessed regarding its technical feasibility and the development plans for the high-voltage grid.
The earliest possible date for ensuring readiness for voltage supply has been set for January 2031, assuming the grid connection agreement is concluded in 2026.
The estimated connection fee, corresponding to the estimated investment outlays, amounts to 10.39 million PLN net, with the possibility of adjustment during the implementation phase.
Price: 30,000 EUR/MW
Should you notice any Illegal Content on the Platform, or content that violates the law, good practices, or the Terms and Conditions for the provision of services on the greensearch.pl online platform, please contact us directly at: kontakt@greensearch.pl. Please title the message "Report of Illegal Content on the Platform" and include a description of the violation along with a link to the offer containing the relevant content.