Project types
BESS Power
0 MW
Capacity
125 MW(p)
Storage Capacity
0 MWh
Project status
Secured land
Country
Poland
Voivodeship
dolnośląskie
Grid connection conditions
YES
Operator
PSE
Voltage
400 kV
Line length
0 km
Minimum rent
0 PLN/ha
Date BP
01/09/2033
Date of COD
01/09/2033
Energy sale
other
Project sale
Other
Price
3,750,000 EUR/MW
Connection Voltage: 400 kV
PV Installation Capacity: 20.496 MW (approx. 25 MWp)
Energy Storage Capacity: 100 MW (grid injection) / 100 MW (grid import)
Planned Energization Date: September 2033
Estimated Connection Fee: PLN 26,407,000.00 net + VAT
The project involves connection to the transmission grid of a non-public distribution system integrated with a 20.5 MW photovoltaic farm and a 100 MW energy storage facility. Connection points - Polkowice,
Based on the connection conditions issued by the Transmission System Operator (PSE S.A.), the project has been qualified for connection at a 400 kV voltage level, with the energization date set for September 2033, assuming the connection agreement is signed in January 2026.
The estimated connection fee, corresponding to the anticipated investment outlays for project implementation, amounts to PLN 26.4 million net, with the possibility of adjustment upon signing the agreement.
Should you notice any Illegal Content on the Platform, or content that violates the law, good practices, or the Terms and Conditions for the provision of services on the greensearch.pl online platform, please contact us directly at: kontakt@greensearch.pl. Please title the message "Report of Illegal Content on the Platform" and include a description of the violation along with a link to the offer containing the relevant content.