Project types
PV Capacity
3.5 MWp
Project status
Building permit obtained
Country
Poland
Voivodeship
opolskie
Grid connection conditions
YES
Operator
Tauron
Line length
3 km
Minimum rent
PLN 10,500/ha
Date BP
31/12/2025
Date of COD
31/12/2026
PV project for sale, located in the Opolskie Voivodeship (Tauron).
Connection capacity: 2.50 MW
Installed capacity: 3.50 MW
Cable line length: approx. 3000 m.
Connection cost according to GCA: 50,000 PLN net.
Building permit: obtained.
Details, documentation, and plot number are available upon contact through greensearch.
Should you notice any Illegal Content on the Platform, or content that violates the law, good practices, or the Terms and Conditions for the provision of services on the greensearch.pl online platform, please contact us directly at: kontakt@greensearch.pl. Please title the message "Report of Illegal Content on the Platform" and include a description of the violation along with a link to the offer containing the relevant content.