PV + BESS - 48 MW + 31.5 MW RTB/COD Q1 2028 (Łódzkie)

greensearch - PV + BESS

Project types

PV

PV Capacity

48 MWp

Project status

Building permit obtained

Country

Poland

Voivodeship

łódzkie

Grid connection conditions

YES

Operator

PGE

Voltage

110 kV

Line length

1.5 km

Minimum rent

22,500 PLN/ha

Date BP

31/12/2025

Date of COD

31/01/2028

Project description

For sale: a photovoltaic (PV) farm project with BESS, located in the Łódź Voivodeship (PGE).


Grid connection conditions:

Export capacity: 31.68 MW

Import capacity: 31.5 MW


PV installed capacity: 48.00 MW

BESS planned capacity: 126 MWh 


Cable line length: approx. 900 m.

Connection cost according to GCA: 3,714,969 PLN net.

Building Permit: 

PV Part I - 32 MWp - secured 

PV Part II + BESS - 16 MWp + 31.5 MW - Q3 2027



Details, documentation, and plot number are available upon contact through greensearch.

Should you notice any Illegal Content on the Platform, or content that violates the law, good practices, or the Terms and Conditions for the provision of services on the greensearch.pl online platform, please contact us directly at: kontakt@greensearch.pl. Please title the message "Report of Illegal Content on the Platform" and include a description of the violation along with a link to the offer containing the relevant content.

Listings added by greensearch - PV + BESS:

No other listings
PARP Logo