Project types
Capacity
100 MWp
Storage Capacity
0 MWh
Project status
Secured land
Country
Poland
Voivodeship
śląskie
Grid connection conditions
YES
Operator
PSE
Voltage
220 kV
Line length
0 km
Minimum rent
0 PLN/ha
Date BP
10/03/2032
Date of COD
10/03/2032
Energy sale
other
Project sale
Other
Price
20,000 EUR/MW
Connection Voltage: 220 kV
Energy Storage Capacity: 100 MW (grid injection) / 100 MW (grid off-take)
Planned energization date: March 2032
Estimated connection fee: 14,875,000.00 PLN net + VAT
The project involves connecting a non-public distribution system, integrated with a 100 MW energy storage system, to the transmission grid.
In accordance with the grid connection conditions issued by the Transmission System Operator (PSE S.A.), the investment is planned for implementation at a 220 kV voltage level, with a planned energization date in March 2032, assuming the connection agreement is signed in 2026.
The estimated connection fee, determined based on projected capital expenditures, amounts to 14.03 million PLN net, with potential for adjustment during the investment's implementation phase.
Should you notice any Illegal Content on the Platform, or content that violates the law, good practices, or the Terms and Conditions for the provision of services on the greensearch.pl online platform, please contact us directly at: kontakt@greensearch.pl. Please title the message "Report of Illegal Content on the Platform" and include a description of the violation along with a link to the offer containing the relevant content.