Project types
Capacity
125 MW(p)
Storage Capacity
0 MWh
Project status
Secured land
Country
Poland
Voivodeship
pomorskie
Grid connection conditions
YES
Operator
PSE
Voltage
400 kV
Line length
0 km
Minimum rent
0 PLN/ha
Date BP
10/04/2032
Date of COD
10/04/2032
Energy sale
other
Project sale
Other
Price
3,750,000 EUR/MW
Connection Voltage: 400 kV
PV Installation Capacity: 20.496 MW
Energy Storage Capacity: 100 MW (grid injection) / 100 MW (grid off-take)
Planned Energization Date: August 2031
Estimated Connection Fee: PLN 14,028,000.00 net + VAT
The project involves connection to the transmission grid of a non-public distribution system, integrated with a 20.5 MW photovoltaic farm and a 100 MW energy storage facility. Connection point - Krzemienica.
In accordance with the connection conditions issued by the Transmission System Operator (PSE S.A.), the investment is planned for implementation at a 400 kV voltage level, with a planned energization date in April 2032, assuming the connection agreement is signed in 2026.
The estimated connection fee, determined based on projected capital expenditures, amounts to 14.03 million PLN net, with potential for adjustment during the investment's implementation phase.
Should you notice any Illegal Content on the Platform, or content that violates the law, good practices, or the Terms and Conditions for the provision of services on the greensearch.pl online platform, please contact us directly at: kontakt@greensearch.pl. Please title the message "Report of Illegal Content on the Platform" and include a description of the violation along with a link to the offer containing the relevant content.