Back
greensearch - BESS logo

100MW BESS + 20MW PV OSDn - PSE - 400kV - (Pomorskie)

greensearch - BESS

Project types

Energy storage

Capacity

125 MW(p)

Storage Capacity

0 MWh

Project status

Secured land

Country

Poland

Voivodeship

pomorskie

Grid connection conditions

YES

Operator

PSE

Voltage

400 kV

Line length

0 km

Minimum rent

0 PLN/ha

Date BP

10/04/2032

Date of COD

10/04/2032

Energy sale

other

Project sale

Other

Price

3,750,000 EUR/MW

Project description

Distribution System Connection Project (OSDn) – PV 20.5 MW + BESS 100 MW / 100 MW


Connection Voltage: 400 kV
PV Installation Capacity: 20.496 MW
Energy Storage Capacity: 100 MW (grid injection) / 100 MW (grid off-take)
Planned Energization Date: August 2031
Estimated Connection Fee: PLN 14,028,000.00 net + VAT


The project involves connection to the transmission grid of a non-public distribution system, integrated with a 20.5 MW photovoltaic farm and a 100 MW energy storage facility. Connection point - Krzemienica.


In accordance with the connection conditions issued by the Transmission System Operator (PSE S.A.), the investment is planned for implementation at a 400 kV voltage level, with a planned energization date in April 2032, assuming the connection agreement is signed in 2026.

The estimated connection fee, determined based on projected capital expenditures, amounts to 14.03 million PLN net, with potential for adjustment during the investment's implementation phase.

Should you notice any Illegal Content on the Platform, or content that violates the law, good practices, or the Terms and Conditions for the provision of services on the greensearch.pl online platform, please contact us directly at: kontakt@greensearch.pl. Please title the message "Report of Illegal Content on the Platform" and include a description of the violation along with a link to the offer containing the relevant content.

Listings added by greensearch - BESS:

No other listings
PARP Logo