PV + BESS 3.94 MWp + 5 MW RTB COD 2028 (Mazowieckie)

greensearch - PV + BESS

Project types

PVEnergy Storage

PV Capacity

3.97 MWp

Storage Capacity

5 MW

Storage Capacity

9.3 MWh

Project status

Building permit obtained

Country

Poland

Voivodeship

mazowieckie

County

Ostrowski

Grid connection conditions

YES

Operator

PGE

Voltage

15 kV

Line length

1.03 km

Minimum rent

19,700 PLN/ha

Date BP

15/05/2025

Date of COD

30/01/2028

Project sale

Transfer of rights

Price

60,000 EUR/MW

Project description

For sale, a hybrid project comprising a photovoltaic farm with a capacity of 3.974 MWp and an energy storage system of 5 MW / 9.3 MWh, located in the Mazowieckie Voivodeship.


The project is offered under an ATA (Assignment Transfer Agreement) through the transfer of rights and holds a final building permit, enabling a swift acquisition and continuation of the investment's implementation.


Key project parameters:

  • Photovoltaic farm: 3.974 MWp
  • Energy storage: 5 MW / 9.3 MWh
  • Obtained building permit (15.05.2025)
  • Grid connection conditions: obtained
  • Grid operator: PGE
  • Connection voltage: 15 kV
  • Connection length: approx. 1.03 km
  • Lease area: 3.43 ha
  • Annual lease rent: 19,700 PLN/ha
  • Planned Date of COD: 30.01.2028

Should you notice any Illegal Content on the Platform, or content that violates the law, good practices, or the Terms and Conditions for the provision of services on the greensearch.pl online platform, please contact us directly at: kontakt@greensearch.pl. Please title the message "Report of Illegal Content on the Platform" and include a description of the violation along with a link to the offer containing the relevant content.