Project types
Capacity
240 MW(p)
Project status
Secured land
Country
Poland
Voivodeship
zachodniopomorskie
Grid connection conditions
YES
Operator
PSE
Voltage
400 kV
Line length
0 km
Minimum rent
0 PLN/ha
Date BP
06/06/2030
Date of COD
01/06/2031
Energy sale
other
Project sale
Other
Price
20,000 EUR/MW
Grid Connection Project for the Distribution System (DSO) – BESS 240 MW / 240 MW
Connection Voltage: 400 kV
Energy Storage Capacity: 240 MW (grid injection) / 240 MW (grid withdrawal)
Planned Energization Date: June 2031
Estimated Connection Fee: 25,565,500.00 PLN net + VAT
The project involves the connection of a distribution system, integrated with energy storage systems with a total installed capacity of 240 MW (charging and discharging), to the transmission grid.
In accordance with the connection conditions issued by Polskie Sieci Elektroenergetyczne S.A. (PSE S.A.), the investment is planned for implementation at a 400 kV voltage level, with the connection point located at the 400/110 kV Żydowo Kierzkowo substation (Busbar Bridge in the 400 kV switchgear).
The earliest energization date has been set for June 2031, assuming the connection agreement is concluded in May 2026. This date may be subject to change during the negotiation of the connection agreement's terms and depending on the Operator's grid investment implementation schedule.
The estimated connection fee, determined based on the connection conditions, amounts to 25,565,500.00 PLN net + VAT, with the possibility of an update during the conclusion of the connection agreement.
Should you notice any Illegal Content on the Platform, or content that violates the law, good practices, or the Terms and Conditions for the provision of services on the greensearch.pl online platform, please contact us directly at: kontakt@greensearch.pl. Please title the message "Report of Illegal Content on the Platform" and include a description of the violation along with a link to the offer containing the relevant content.