Project types
BESS Power
8 MW
Storage Capacity
38 MWh
Project status
Zoning plan amended
Country
Poland
Voivodeship
wielkopolskie
Grid connection conditions
YES
Operator
Energa
Voltage
15 kV
Line length
0.3 km
Minimum rent
20,000 PLN/ha
Date BP
01/08/2026
Energy sale
other
Project sale
Share Sale, Funding Sought, JV
Price
60,000 EUR/MW
An energy storage project located in the Wielkopolskie Voivodeship (Energa), currently at the pre-RTB stage, is available for sale.
Land parcel with a local spatial development plan designated for production/services.
Discharging capacity: 8 MW
Charging Power: 4 MW
Storage Capacity: 38.4 MWh
Land secured by a lease agreement, with an annual rent of PLN 20k payable from the commencement of construction, and no standby fees.
Connection length to the Main Supply Point (GPZ): approx. 300 m - route secured.
Grid connection agreement signed.
Planned energization: 30.09.2026.
Connection cost according to the Grid Connection Agreement: PLN 159,000.
Should you notice any Illegal Content on the Platform, or content that violates the law, good practices, or the Terms and Conditions for the provision of services on the greensearch.pl online platform, please contact us directly at: kontakt@greensearch.pl. Please title the message "Report of Illegal Content on the Platform" and include a description of the violation along with a link to the offer containing the relevant content.