BESS - 45 MW pre-RTB COD 2029 (Mazowieckie)

greensearch - BESS

Project types

Energy storage

BESS Power

45 MW

Storage Capacity

217 MWh

Project status

Zoning plan amended

Country

Poland

Voivodeship

mazowieckie

Grid connection conditions

YES

Operator

Energa

Voltage

110 kV

Line length

1.6 km

Date BP

30/09/2027

Date of COD

30/06/2029

Project description

For sale: a large-scale energy storage project (BESS) with a capacity of 45 MW and 217 MWh, located in Mazowieckie Voivodeship.


Key project parameters:

  • Energy storage power: 45 MW
  • Energy storage capacity: 217 MWh
  • Storage operating time: 4 hours
  • Charging power: 45 MW
  • Discharging power: 45 MW
  • Connection voltage: 110 kV
  • Network operator: ENERGA-OPERATOR S.A.
  • Estimated connection length: approx. 1.6 km
  • Estimated connection cost: 1,750,000 PLN
  • Planned connection date as per the connection agreement: 30.06.2029
  • Planned RTB status: Q3 2027

Project status:

  • Land secured for the investment
  • Connection conditions obtained
  • Local Spatial Development Plan / Locational decision - secured
  • Environmental decision in progress
  • Work is underway on the cable route
  • Building permit in progress
  • Connection agreement - under preparation


More information available upon signing an NDA.

Should you notice any Illegal Content on the Platform, or content that violates the law, good practices, or the Terms and Conditions for the provision of services on the greensearch.pl online platform, please contact us directly at: kontakt@greensearch.pl. Please title the message "Report of Illegal Content on the Platform" and include a description of the violation along with a link to the offer containing the relevant content.

Listings added by greensearch - BESS:

No other listings
PARP Logo