240 BESS MW OSDn - PSE - 400kV - (Kujawsko-Pomorskie)

greensearch - BESS

Project types

Energy storage

BESS Power

240 MW

Project status

Secured land

Country

Poland

Voivodeship

pomorskie

Grid connection conditions

YES

Operator

PSE

Voltage

400 kV

Line length

0 km

Minimum rent

0 PLN/ha

Date BP

01/03/2033

Date of COD

01/03/2033

Energy sale

other

Project sale

Other

Project description

Grid Connection Project for the Distribution System (DSO) – BESS 240 MW / 240 MW


Connection voltage: 400 kV
Energy storage capacity: 240 MW (grid injection) / 240 MW (grid off-take)
Planned energization date: March 2033


Estimated connection fee: PLN 14,028,000.00 net + VAT

The project concerns the connection to the transmission grid of a private distribution system comprising an energy storage facility with a capacity of 240 MW / 240 MW. Connection point - Grudziądz Węgrowo


Based on the connection conditions issued by the Transmission System Operator (PSE S.A.), the investment has been qualified for implementation at a voltage level of 400 kV, with the energization readiness date set for March 2033, assuming the connection agreement is concluded in 2026.


The estimated connection fee, corresponding to the anticipated investment outlays, amounts to PLN 14.03 million net, with the possibility of adjustment during the implementation phase or upon signing the agreement.

Should you notice any Illegal Content on the Platform, or content that violates the law, good practices, or the Terms and Conditions for the provision of services on the greensearch.pl online platform, please contact us directly at: kontakt@greensearch.pl. Please title the message "Report of Illegal Content on the Platform" and include a description of the violation along with a link to the offer containing the relevant content.