Project types
Capacity
240 MW(p)
Project status
Secured land
Country
Poland
Voivodeship
śląskie
Grid connection conditions
YES
Operator
PSE
Voltage
220 kV
Line length
0 km
Minimum rent
0 PLN/ha
Date BP
31/03/2030
Date of COD
01/06/2032
Energy sale
other
Project sale
Other
Price
20,000 EUR/MW
Connection voltage: 220 kV
Energy Storage Capacity: 240 MW (grid injection) / 240 MW (grid withdrawal)
Planned energization date: June 2032.
Estimated connection fee: 22,692,666.67 PLN net + VAT
The project involves the connection of a distribution system, integrated with energy storage systems with a total installed capacity of 240 MW (charging and discharging), to the transmission grid.
In accordance with the grid connection conditions issued by Polskie Sieci Elektroenergetyczne S.A. (PSE S.A.), the investment is planned for implementation at a 400 kV voltage level, with the connection point located at the 400/220 kV Joachimów substation (Busbar Bridge in the 220 kV switchgear).
The earliest date for ensuring readiness for voltage supply has been set for June 2032, assuming the grid connection agreement is concluded in May 2026. This date may be subject to change during the negotiation of the grid connection agreement's terms and depending on the Operator's schedule for grid infrastructure investments.
The estimated connection fee, determined based on the connection conditions, amounts to 22,692,666.67 PLN net + VAT, with the possibility of update during the conclusion of the connection agreement.
Should you notice any Illegal Content on the Platform, or content that violates the law, good practices, or the Terms and Conditions for the provision of services on the greensearch.pl online platform, please contact us directly at: kontakt@greensearch.pl. Please title the message "Report of Illegal Content on the Platform" and include a description of the violation along with a link to the offer containing the relevant content.