Project types
Power
125 MW(p)
Project status
Zoning plan amended
Country
Poland
Voivodeship
mazowieckie
Connection conditions
YES
Operator
PSE
Voltage
220 kV
Line length
0 km
Minimum rent
0 PLN/ha
Date BP
December 31, 2028
Date of COD
July 31, 2031
Energy sales
other
Sale of the project
Other
Price
€20,000/MW
Connection voltage: 220 kV
PV installation capacity: 20.496 MW (approximately 25 MWp)
Energy storage capacity: 100 MW (feed-in) / 100 MW (feed-out)
Planned date of readiness for voltage supply: July 2031.
Estimated connection fee: PLN 11,323,000.00 net + VAT
The project involves connecting a non-public distribution system integrated with a 20.5 MW photovoltaic farm and a 100 MW energy storage facility to the transmission grid.
Based on the connection conditions issued by the Transmission System Operator (PSE S.A.), the project has been qualified for connection at a voltage level of 220 kV, with the date of readiness for voltage supply set for July 2031, assuming that the connection agreement is signed in 2026.
The estimated connection fee, corresponding to the anticipated investment costs, amounts to PLN 11.3 million net, subject to adjustment at the time of signing the agreement.
If you notice any Illegal Content on the Platform, or content that is contrary to the law, good manners, or the Terms of Service of the Greensearch.pl internet platform, please contact us directly at:greensearch. Please title your message "Reporting illegal content on the Platform" and include a description of the violation along with a link to the offer containing the content in question.