100 BESS MW + 20 PV MW OSDn - PSE - 220kV - Mazowieckie

greensearch BESS

Project types

Energy storage

Power

125 MW(p)

Project status

Zoning plan amended

Country

Poland

Voivodeship

mazowieckie

Connection conditions

YES

Operator

PSE

Voltage

220 kV

Line length

0 km

Minimum rent

0 PLN/ha

Date BP

December 31, 2028

Date of COD

July 31, 2031

Energy sales

other

Sale of the project

Other

Price

€20,000/MW

Ad description

Distribution system connection project (OSDn) – PV 20.5 MW + BESS 100 MW / 100 MW


Connection voltage: 220 kV

PV installation capacity: 20.496 MW (approximately 25 MWp)


Energy storage capacity: 100 MW (feed-in) / 100 MW (feed-out)


Planned date of readiness for voltage supply: July 2031.

Estimated connection fee: PLN 11,323,000.00 net + VAT


The project involves connecting a non-public distribution system integrated with a 20.5 MW photovoltaic farm and a 100 MW energy storage facility to the transmission grid.


Based on the connection conditions issued by the Transmission System Operator (PSE S.A.), the project has been qualified for connection at a voltage level of 220 kV, with the date of readiness for voltage supply set for July 2031, assuming that the connection agreement is signed in 2026.

The estimated connection fee, corresponding to the anticipated investment costs, amounts to PLN 11.3 million net, subject to adjustment at the time of signing the agreement.

If you notice any Illegal Content on the Platform, or content that is contrary to the law, good manners, or the Terms of Service of the Greensearch.pl internet platform, please contact us directly at:greensearch. Please title your message "Reporting illegal content on the Platform" and include a description of the violation along with a link to the offer containing the content in question.

Listings posted by greensearch BESS:

No other announcements
PARP logo