BESS - 50 MW pre-RTB, COD 2029 (zachodniopomorskie)

greensearch BESS

Project types

Energy storage

BESS power

50 MW

Storage capacity

228 MWh

Project status

Zoning plan amended

Country

Poland

Voivodeship

zachodniopomorskie

County

From Kołobrzeg

Connection conditions

YES

Operator

Energa

Voltage

110 kV

Line length

2.9 km

Date BP

September 30, 2027

Date of COD

January 31, 2029

Ad description

The project includes a large-scale energy storage facility with a capacity of 50 MW and a storage capacity of 228 MWh.


Key project parameters:

• Energy storage capacity: 50 MW

• Energy storage capacity: 228 MWh

• Battery life: over 4 hours

• Charging power: 50 MW

• Discharge power: 50 MW

• Connection voltage: 110 kV

• Grid operator: ENERGA-OPERATOR S.A.

• Estimated length of the connection: approx. 2.9 km

• Estimated connection cost: PLN 1,250,000

• Scheduled connection date: January 31, 2029

• Planned RTB status: Q3 2027


Project status:


• Land secured for the project

• Connection terms obtained

• Signed connection agreement

• Environmental decision currently under review

• Work is underway to secure the cable route

• Project in the pre-RTB phase



Detailed technical documentation and design information are available upon signing an NDA.

If you notice any Illegal Content on the Platform, or content that is contrary to the law, good manners, or the Terms of Service of the Greensearch.pl internet platform, please contact us directly at:greensearch. Please title your message "Reporting illegal content on the Platform" and include a description of the violation along with a link to the offer containing the content in question.

Listings posted by greensearch BESS:

No other announcements
PARP logo