Project types
BESS power
50 MW
Storage capacity
228 MWh
Project status
Zoning plan amended
Country
Poland
Voivodeship
zachodniopomorskie
County
From Kołobrzeg
Connection conditions
YES
Operator
Energa
Voltage
110 kV
Line length
2.9 km
Date BP
September 30, 2027
Date of COD
January 31, 2029
The project includes a large-scale energy storage facility with a capacity of 50 MW and a storage capacity of 228 MWh.
Key project parameters:
• Energy storage capacity: 50 MW
• Energy storage capacity: 228 MWh
• Battery life: over 4 hours
• Charging power: 50 MW
• Discharge power: 50 MW
• Connection voltage: 110 kV
• Grid operator: ENERGA-OPERATOR S.A.
• Estimated length of the connection: approx. 2.9 km
• Estimated connection cost: PLN 1,250,000
• Scheduled connection date: January 31, 2029
• Planned RTB status: Q3 2027
Project status:
• Land secured for the project
• Connection terms obtained
• Signed connection agreement
• Environmental decision currently under review
• Work is underway to secure the cable route
• Project in the pre-RTB phase
Detailed technical documentation and design information are available upon signing an NDA.
If you notice any Illegal Content on the Platform, or content that is contrary to the law, good manners, or the Terms of Service of the Greensearch.pl internet platform, please contact us directly at:greensearch. Please title your message "Reporting illegal content on the Platform" and include a description of the violation along with a link to the offer containing the content in question.