Project types
Power
125 MW(p)
Storage capacity
0 MWh
Project status
Secured land
Country
Poland
Voivodeship
wielkopolskie
Connection conditions
YES
Operator
PSE
Voltage
110 kV
Line length
0 km
Minimum rent
0 PLN/ha
Date BP
01/06/2031
Date of COD
01/06/2031
Energy sales
other
Sale of the project
Other
Price
€20,000/MW
Connection voltage: 110 kV
PV installation capacity: 20.496 MW (approx. 25 MWp)
Energy storage capacity: 100 MW (feed-in) / 100 MW (feed-out)
Planned date of readiness for voltage supply: January 2031.
Estimated connection fee: PLN 10,390,000.00 net + VAT
The project involves connecting a non-public distribution system integratedwith a 20.5 MW photovoltaic farm and a 100 MW energy storage facility to the transmission grid.
In accordance with the connection conditions issued by the Transmission System Operator, the project has been positively assessed in terms of technical feasibility and high-voltage network development plans.
The earliest possible date for ensuring readiness to supply voltage has been set for January 2031, assuming that a connection agreement is concluded in 2026.
The anticipated connection fee, corresponding to the estimated investment costs, amounts to PLN 10.39 million net, subject to adjustment during implementation.
Price: EUR 30,000/MW
If you notice any Illegal Content on the Platform, or content that is contrary to the law, good manners, or the Terms of Service of the Greensearch.pl internet platform, please contact us directly at:greensearch. Please title your message "Reporting illegal content on the Platform" and include a description of the violation along with a link to the offer containing the content in question.