Return
greensearch  BESS logo

100MW BESS + 20MW PV OSDn - PSE - 400kV - Łódzkie

greensearch BESS

Project types

Energy storage

Power

125 MW(p)

Storage capacity

0 MWh

Project status

Secured land

Country

Poland

Voivodeship

łódzkie

Connection conditions

YES

Operator

PSE

Voltage

400 kV

Line length

0 km

Minimum rent

0 PLN/ha

Date BP

August 1, 2031

Date of COD

August 1, 2031

Energy sales

other

Sale of the project

Other

Price

EUR 3,750,000/MW

Ad description

Distribution system connection project (OSDn) – PV 20.5 MW + BESS 100 MW / 100 MW


Connection voltage: 400 kV
PV system capacity: 20.496 MW
Energy storage capacity: 100 MW (feed-in) / 100 MW (draw from the grid)
Planned date of readiness for power supply: August 2031
Estimated connection fee: PLN 14,028,000.00 net + VAT


The project involves connecting a private distribution system to the transmission grid, integrated with a 20.5 MW photovoltaic farm and a 100 MW energy storage facility. Connection Point: Witonia


In accordance with the connection terms issued by the Transmission System Operator (PSE S.A.), the project is planned to be implemented at the 400 kV voltage level, with the target date for energization set for August 2031, assuming that the connection agreement is signed in 2026.


The estimated connection fee, determined on the basis of anticipated capital expenditure, amounts to PLN 14.03 million net, subject to adjustment during the investment implementation stage.

If you notice any Illegal Content on the Platform, or content that is contrary to the law, good manners, or the Terms of Service of the Greensearch.pl internet platform, please contact us directly at:greensearch. Please title your message "Reporting illegal content on the Platform" and include a description of the violation along with a link to the offer containing the content in question.

Listings posted by greensearch BESS:

No other announcements
PARP logo