BESS - 50 MW pre-RTB, COD 2028 (warmińsko-mazurskie)

greensearch BESS

Project types

Energy storage

BESS power

50 MW

Storage capacity

227 MWh

Project status

Zoning plan amended

Country

Poland

Voivodeship

warmińsko-mazurskie

Connection conditions

YES

Operator

Energa

Voltage

110 kV

Line length

0.15 km

Date BP

September 30, 2027

Date of COD

December 31, 2028

Ad description

A large-scale energy storage system (BESS) project with a capacity of 50 MW and 227 MWh is for sale, located in the Warmian-Masurian Voivodeship.


Key project parameters:

  • Energy storage capacity: 50 MW
  • Energy storage capacity: 227 MWh
  • Battery life: over 4 hours
  • Charging power: 50 MW
  • Discharge power: 50 MW
  • Connection voltage: 110 kV
  • Network operator: Energa-Operator S.A.
  • Estimated length of the connection: approx. 150 m
  • Estimated connection cost: PLN 1,250,000
  • Scheduled connection date as specified in the connection agreement: December 31, 2028
  • Planned RTB status: Q3 2027

Project status:

  • Land secured for the project
  • Connection terms obtained
  • Work on the cable route is underway
  • Building permit currently being processed
  • Connection agreement - currently being drafted


Detailed project documentation is available upon signing an NDA.

If you notice any Illegal Content on the Platform, or content that is contrary to the law, good manners, or the Terms of Service of the Greensearch.pl internet platform, please contact us directly at:greensearch. Please title your message "Reporting illegal content on the Platform" and include a description of the violation along with a link to the offer containing the content in question.