Return
greensearch  BESS logo

240/49 BESS MW OSDn - PSE - 110 kV - Dolnośląskie

greensearch BESS

Project types

Energy storage

Power

240 MW(p)

Project status

Secured land

Country

Poland

Voivodeship

dolnośląskie

Connection conditions

YES

Operator

PSE

Voltage

219.97 kV

Price

€20,000/MW

Ad description

Distribution System Connection Project (OSDn) – BESS 49 MW / 240 MW

Connection voltage: 220 kV

Energy storage capacity: 49 MW (feed-in) / 240 MW (draw from the grid)

Scheduled date for power supply readiness: December 2034

Estimated connection fee: PLN 22,692,666.67 (net) + VAT


The project involves connecting a distribution system—integrated with energy storage facilities with a total installed capacity—to the transmission grid, with a limit of 49 MW on power fed into the grid and 240 MW on power drawn from it.


In accordance with the connection terms issued by Polskie Sieci Elektroenergetyczne S.A. (PSE S.A.), the project is planned to be implemented at the 220 kV voltage level, with the connection point located at the 400/220/110 kV Polkowice substation (Rail Bridge in the 220 kV switchyard).


The earliest date for ensuring readiness to supply power has been set for December 2034, assuming that the connection agreement is signed in July 2026. This date may change during the negotiation of the connection agreement and depending on the Operator’s network investment schedule.


The estimated connection fee, determined based on the connection terms and conditions, amounts to PLN 22,692,666.67 net plus VAT, subject to adjustment at the time the connection agreement is signed.

If you notice any Illegal Content on the Platform, or content that is contrary to the law, good manners, or the Terms of Service of the Greensearch.pl internet platform, please contact us directly at:greensearch. Please title your message "Reporting illegal content on the Platform" and include a description of the violation along with a link to the offer containing the content in question.