240 MW(p)
Project status
Secured land
Country
Poland
Voivodeship
łódzkie
Connection conditions
YES
Operator
PSE
Voltage
219.98 kV
Price
€20,000/MW
Distribution system connection project (OSDn) – BESS 240 MW / 240 MW
Connection voltage: 220 kV
Energy storage capacity: 240 MW (fed into the grid) / 240 MW (drawn from the grid)
Scheduled date for power supply readiness: April 2033
Estimated connection fee: PLN 22,692,666.67 (net) + VAT
The project involves connecting a distribution system integrated with energy storage facilities with a total installed capacity of 240 MW (charging and discharging) to the transmission grid.
In accordance with the connection terms issued by Polskie Sieci Elektroenergetyczne S.A. (PSE S.A.), the project is planned to be implemented at the 220 kV voltage level, with the connection point located at the 400/220 kV Rogowiec substation (Busbar in the 220 kV switchyard).
The earliest date for ensuring readiness to supply power has been set for April 2033, assuming that the connection agreement is signed in June 2026. This date is subject to change during the negotiation of the connection agreement and depending on the Operator’s network investment schedule.
The estimated connection fee, determined based on the connection terms and conditions, amounts to PLN 22,692,666.67 net plus VAT, subject to adjustment at the time the connection agreement is signed.
If you notice any Illegal Content on the Platform, or content that is contrary to the law, good manners, or the Terms of Service of the Greensearch.pl internet platform, please contact us directly at:greensearch. Please title your message "Reporting illegal content on the Platform" and include a description of the violation along with a link to the offer containing the content in question.