Project types
Power
240 MW(p)
Project status
Secured land
Country
Poland
Voivodeship
śląskie
Connection conditions
YES
Operator
PSE
Voltage
109.99 kV
Price
€20,000/MW
Distribution System Connection Project (OSDn) – BESS 240 MW / 110 MW
Connection voltage: 110 kV
Energy storage capacity: 240 MW (feed-in) / 110 MW (draw from the grid)
Scheduled date for power supply readiness: December 2028
Estimated connection fee: PLN 22,045,666.67 net + VAT
The project involves connecting a distribution system integrated with energy storage facilities with a total installed capacity of 240 MW (charging and discharging) to the transmission grid.
In accordance with the connection terms issued by Polskie Sieci Elektroenergetyczne S.A. (PSE S.A.), the project is planned to be implemented at the 110 kV voltage level, with the connection point located at the 400/220 kV Łośnice substation (Busbar in the 110 kV GIS switchgear).
The earliest date for ensuring readiness to supply power has been set for December 2028, assuming that the connection agreement is signed in June 2026. This date is subject to change during the negotiation of the connection agreement and depending on the Operator’s network investment schedule.
The estimated connection fee, determined based on the connection terms and conditions, amounts to PLN 22,045,666.67 net plus VAT, subject to adjustment at the time the connection agreement is entered into.
If you notice any Illegal Content on the Platform, or content that is contrary to the law, good manners, or the Terms of Service of the Greensearch.pl internet platform, please contact us directly at:greensearch. Please title your message "Reporting illegal content on the Platform" and include a description of the violation along with a link to the offer containing the content in question.