Project types
Capacity
240 MW(p)
Project status
Secured land
Country
Poland
Voivodeship
śląskie
Grid connection conditions
YES
Operator
PSE
Voltage
109.99 kV
Price
20,000 EUR/MW
Distribution System Connection Project (DSO) – BESS 240 MW / 110 MW
Connection voltage: 110 kV
Energy storage capacity: 240 MW (grid injection) / 110 MW (grid consumption)
Planned energization date: December 2028
Estimated connection fee: 22,045,666.67 PLN net + VAT
The project involves the connection of a distribution system, integrated with energy storage systems with a total installed capacity of 240 MW (charging and discharging), to the transmission grid.
In accordance with the grid connection conditions issued by Polskie Sieci Elektroenergetyczne S.A. (PSE S.A.), the investment is planned for implementation at a 110 kV voltage level, with the connection point located at the 400/220 kV Łośnice substation (Busbar Bridge in the 110 kV GIS switchgear).
The earliest energization date is set for December 2028, assuming the connection agreement is concluded in June 2026. This date may change during the negotiation of the connection agreement's terms and depending on the Operator's grid investment implementation schedule.
The estimated connection fee, determined based on the connection conditions, amounts to 22,045,666.67 PLN net + VAT, with the possibility of adjustment during the conclusion of the connection agreement.
Should you notice any Illegal Content on the Platform, or content that violates the law, good practices, or the Terms and Conditions for the provision of services on the greensearch.pl online platform, please contact us directly at: kontakt@greensearch.pl. Please title the message "Report of Illegal Content on the Platform" and include a description of the violation along with a link to the offer containing the relevant content.