Return
greensearch  BESS logo

BESS - 45 MW pre-RTB, COD 2029 (pomorskie)

greensearch BESS

Project types

Energy storage

BESS power

45 MW

Storage capacity

217 MWh

Project status

Secured land

Country

Poland

Voivodeship

pomorskie

Connection conditions

YES

Operator

Energa

Voltage

110 kV

Line length

3.7 km

Date BP

March 31, 2027

Date of COD

January 31, 2029

Ad description

A 45 MW battery energy storage system (BESS) with a capacity of 217 MWh, located in the Pomeranian Voivodeship, is for sale.


The project is at an advanced stage of development and has been granted the necessary permits for connection to the 110-kilovolt high-voltage grid. 


Key project parameters:

• Technology: BESS
• Power: 45 MW
• Capacity: 217 MWh
• Operating time: 4+ hours
• Connection voltage: 110 kV
• Grid operator: ENERGA-OPERATOR S.A.
• Estimated connection length: approx. 3.7 km
• Estimated connection cost: PLN 625,000
• Planned RTB date: Q1 2027
• Planned connection date: January 31, 2029



Advantages of the project:

• Location in northern Poland with access to high-voltage infrastructure
• Relatively low connection cost per MW
• Short path to achieving RTB status
• Project designed for the development of a large-scale energy storage facility with an operating time exceeding 4 hours
• Potential to provide balancing and flexibility services for the National Power System



Detailed documentation, location, and technical materials are available upon signing an NDA.

If you notice any Illegal Content on the Platform, or content that is contrary to the law, good manners, or the Terms of Service of the Greensearch.pl internet platform, please contact us directly at:greensearch. Please title your message "Reporting illegal content on the Platform" and include a description of the violation along with a link to the offer containing the content in question.