Return
greensearch  BESS logo

BESS - 50 MW pre-RTB, COD 2030 (dolnośląskie)

greensearch BESS

Project types

Energy storage

BESS power

50 MW

Storage capacity

258 MWh

Project status

Zoning plan amended

Country

Poland

Voivodeship

dolnośląskie

Connection conditions

YES

Operator

Tauron

Voltage

110 kV

Line length

3 km

Date BP

March 31, 2027

Date of COD

December 31, 2030

Ad description

A large-scale battery energy storage system (BESS) project with a capacity of 50 MW and 258 MWh is for sale, located in the Lower Silesia Province.


Key project parameters:

  • Energy storage capacity: 50 MW
  • Energy storage capacity: 258 MWh
  • Battery life: over 5 hours
  • Charging power: 50 MW
  • Discharge capacity: 50.79 MW
  • Connection voltage: 110 kV
  • Network operator: Tauron Distribution S.A.
  • Estimated length of the connection: approx. 3.0 km
  • Estimated connection cost: 1,554,413 PLN
  • Scheduled connection date as specified in the connection agreement: December 31, 2030
  • Planned RTB status: Q1 2027

Project status:

  • Land secured for the project
  • Connection terms obtained
  • Planning decisions obtained
  • Environmental decision currently under review
  • Work on the cable route is underway
  • Building permit currently being processed
  • Connection agreement - currently being drafted


Detailed project documentation is available upon signing an NDA.

If you notice any Illegal Content on the Platform, or content that is contrary to the law, good manners, or the Terms of Service of the Greensearch.pl internet platform, please contact us directly at:greensearch. Please title your message "Reporting illegal content on the Platform" and include a description of the violation along with a link to the offer containing the content in question.

Listings posted by greensearch BESS:

No other announcements
PARP logo