PV + BESS 200 MWp + 45 MW RTB 2027/COD 2030 (Dolnośląskie)

greensearch PV + BESS

Project types

PVEnergy storage

PV power

200 MWp

The power of storage

45 MW

Storage capacity

200 MWh

Project status

Environmental decision received

Country

Poland

Voivodeship

dolnośląskie

Connection conditions

YES

Operator

PSE

Voltage

400 kV

Line length

7.99 km

Minimum rent

PLN 18,000/ha

Ad description

A hybrid PV + energy storage project located in the Lower Silesia Province is for sale.

PV capacity: 200 MWp
BESS capacity: 45 MW (approx. 200 MWh)

Land secured – approx. 200 ha.
Lease rent: approx. 18,000 PLN/ha.

Project status:

  • Secured lease
  • Environmental decision received
  • A local zoning plan that allows for the implementation of the project
  • Connection Terms (PSE – 400 kV)
  • Connection Agreement (scheduled to be signed in 2027)
  • Building permit: planned for 2026–2027

Connection to the transmission grid (PSE) – approximately 8 km of line (110 kV + 400 kV).
Estimated connection cost: approximately PLN 14 million (with the possibility of cost-sharing).

Planned launch date: November 2031.

The project was designed using a hybrid PV + BESS model.

Share deal transaction (100% of shares in the SPV).
Access to the documentation will be provided upon signing the NDA.

Details are available upon request via greensearch.

If you notice any Illegal Content on the Platform, or content that is contrary to the law, good manners, or the Terms of Service of the Greensearch.pl internet platform, please contact us directly at:greensearch. Please title your message "Reporting illegal content on the Platform" and include a description of the violation along with a link to the offer containing the content in question.