Project types
PV power
200 MWp
The power of storage
45 MW
Storage capacity
200 MWh
Project status
Environmental decision received
Country
Poland
Voivodeship
dolnośląskie
Connection conditions
YES
Operator
PSE
Voltage
400 kV
Line length
7.99 km
Minimum rent
PLN 18,000/ha
A hybrid PV + energy storage project located in the Lower Silesia Province is for sale.
PV capacity: 200 MWp
BESS capacity: 45 MW (approx. 200 MWh)
Land secured – approx. 200 ha.
Lease rent: approx. 18,000 PLN/ha.
Project status:
Connection to the transmission grid (PSE) – approximately 8 km of line (110 kV + 400 kV).
Estimated connection cost: approximately PLN 14 million (with the possibility of cost-sharing).
Planned launch date: November 2031.
The project was designed using a hybrid PV + BESS model.
Share deal transaction (100% of shares in the SPV).
Access to the documentation will be provided upon signing the NDA.
Details are available upon request via greensearch.
If you notice any Illegal Content on the Platform, or content that is contrary to the law, good manners, or the Terms of Service of the Greensearch.pl internet platform, please contact us directly at:greensearch. Please title your message "Reporting illegal content on the Platform" and include a description of the violation along with a link to the offer containing the content in question.